Project: Consultancy Services for preparation of Feasibility Study Report for two laning with paved rigid/flexi shoulders of selected stretches of newly declared & existing State Highways (355.82 km) – PKG VI
Client: Madhya Pradesh Road Development Corporation (MPRDC)
The Madhya Pradesh Road Development Corporation (MPRDC) has been entrusted with the assignment of Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of State Roads / Major District Roads in the State of Madhya Pradesh for up gradation to Two lane with paved rigid / flexi shoulder configuration.
The main objective of the consultancy service is to establish the technical, economical, and financial viability of the project and prepare feasibility reports for upgrading of the existing road to 2 lane configuration. The viability of the project shall be established taking into account the requirements with regard to upgrading and improvement based on highway design, pavement design and widening of existing and/or construction of new bridges and structures, road safety features, quantities of various items of works and cost estimates and economic analysis.
Scope of Work undertaken by DIMTS
- Preparation of Quality Assurance Plan (QAP).
- Preparation of Inception Report
- Review of Data and Documents
- Road condition and inventory
- Condition of bridges and cross-drainage structures
- Vehicle loading behavior (axle load spectrum), if available
- Type and location of existing utility services
- Traffic Surveys
- OD Surveys, Axle Load Surveys, Speed Delay Surveys etc.
- Engineering Surveys and Investigations
- Reconnaissance and Alignment
- Topographic Surveys
- Road Inventory Surveys
- Geo-technical Investigationsv
- Preparation of Alignment Report, Traffic Survey Report, Utility Relocation Report and Land Acquisition Report
- Preparation of Social impact assessment and Environmental impact assessment plans.
- Preparation of Preliminary Design and Drawings (GAD)
- Preparation of Preliminary Estimate for quantities and project costs, including the cost of environmental and social safeguards if any.
- Viability and Financing
- Financial & Economic Analysis
- Preparation of Tender schedules (DBFOT basis) and support in Bid process Management & selection of Contractor
Feasibility Study of Major District Roads, MP
Project:Consultancy Services for preparation of Feasibility Study Report for two laning with paved rigid/flexi shoulders of selected stretches of newly declared and existing major district roads (175 km) – PKG X.
Client: Madhya Pradesh Road Development Corporation (MPRDC)
The Madhya Pradesh Road Development Corporation (MPRDC) has been entrusted with the assignment of Consultancy Services for preparation of Detailed Project Report of selected stretches/corridors of State Roads / Major District Roads in the State of Madhya Pradesh for up gradation to Two lane with paved rigid / flexi shoulder configuration.
The main objective of the consultancy service is to establish the technical, economical, and financial viability of the project and prepare feasibility reports for upgrading of the existing road to 2 lane configuration. The viability of the project shall be established taking into account the requirements with regard to upgrading and improvement based on highway design, pavement design and widening of existing and/or construction of new bridges and structures, road safety features, quantities of various items of works and cost estimates and economic analysis.
Scope of Work undertaken by DIMTS
- Preparation of Quality Assurance Plan (QAP).
- Preparation of Inception Report
- Review of Data and Documentsv
- Road condition and inventory
- Condition of bridges and cross-drainage structures
- Vehicle loading behavior (axle load spectrum), if available
- Type and location of existing utility services
- Traffic Surveys
- OD Surveys, Axle Load Surveys, Speed Delay Surveys etc.
- Engineering Surveys and Investigations
- Reconnaissance and Alignment
- Topographic Surveys
- Road Inventory Surveys
- Geo-technical Investigations
- Preparation of Alignment Report, Traffic Survey Report, Utility Relocation Report and Land Acquisition Report
- Preparation of Social impact assessment and Environmental impact assessment plans.
- Preparation of Preliminary Design and Drawings (GAD)
- Preparation of Preliminary Estimate for quantities and project costs, including the cost of environmental and social safeguards if any.
- Viability and Financing
- Financial & Economic Analysis
- Preparation of Tender schedules (DBFOT Basis) and support in Bid process Management & selection of Contractor.
Project:Consultancy Services for Survey, Crust Design, Cross - Section, L - Section, Rough Cost Estimate, Road Safety Audit, BOQ and other related works for Master roads from Sector 68 to 80, Gurugram
Client: Haryana Urban Development Authority (HUDA)
The Haryana Urban Development Authority (HUDA) has been entrusted with the development of Master Sector Roads in Gurugram from sector 68 to 80 for up gradation to two lane and as per State / National Highway configuration.
The main objective of the consultancy service is to establish the technical, economical, and financial viability of the project and prepare detailed project report for development of Master Sector Roads to 2 lane with State / National Highway configuration. The viability of the project shall be established taking into account the requirements with regard to upgrading and improvement based on design parameters like pavement design, development or widening of existing and/or construction of new roads, type of structures i.e. bridges, drains, culverts and related structures, road safety features, quantities of various items of works and cost estimates and economic analysis.
Scope of Work undertaken by DIMTS
- Preparation of Inception Report
- Review of Data and Documentsv
- Road condition and inventory
- Type and location of existing utility services
- Carry out Traffic Surveys
- Engineering Surveys and Investigations
- Reconnaissance and Alignment
- Topographic Surveys
- Road Inventory Surveys
- Geo-technical Investigations
- Preparation of Alignment Report, Traffic Survey Report, Utility Relocation Report and Land Acquisition Plan
- Preparation of Pre-Feasibility and Feasibility Report
- Preparation of Preliminary & Detailed Design and Drawings (GAD)
- Preparation of block cost & detailed Cost Estimates and BOQs.
- Preparation of Detailed Project Report and Technical Specifications.
- Preparation of Tender documents.